About #MascotteIndonesia
"Not being finished in a correct studio, it was an issue of whoever was about just buying up the suitable devices and laying down the tracks.By 2008, all R62As about the 7 ended up upgraded with LED lighted indications to differentiate amongst express and native trains. These signs can be found around the rollsigns which have been identified over t